Sagewind is an oxide gold project in north-central Nevada, 100% owned by Tessaline through 186 unpatented lode claims. A pre-feasibility study completed in July 2026 outlines an open-pit, run-of-mine heap-leach operation producing about 112,000 ounces of gold a year for 11 years.

Geology

Gold occurs as fine particles in silicified, decalcified limestone and chert along a north-trending fault corridor. Oxidation reaches about 180 metres below surface, so the ore can be leached without milling. The North Zone, drilled in 2026, extends the deposit 600 metres along strike.

Pre-feasibility study

ItemResult
After-tax NPV (5%)US$412 million
After-tax IRR31.4%
Initial capitalUS$268 million
All-in sustaining costUS$1,180 per ounce
Mine life11 years
Gold price (base case)US$2,600 per ounce

Next steps

A feasibility study and the environmental baseline for the plan of operations are under way, with a decision on permitting planned for 2027.

Resources and Reserves

Sagewind mineral resource and reserve estimate · Effective June 30, 2026
CategoryTonnageGradeContained
Proven11,800,0000.95 g/t Au360,400 oz Au
Probable29,600,0000.86 g/t Au818,400 oz Au
Measured12,400,0000.92 g/t Au366,800 oz Au
Indicated38,900,0000.84 g/t Au1,050,600 oz Au
Inferred21,300,0000.71 g/t Au486,200 oz Au

Mineral resources effective March 31, 2026, pit-constrained at a 0.20 g/t gold cut-off; mineral reserves effective June 30, 2026, from the pre-feasibility study at US$2,600 per ounce. Resources include reserves. Tonnes are metric. Invented figures for a demonstration site.